Portfolio

Tullynamoyle Windfarm (Phase2)

, , , , , , , , ,

 

Main Civils and Building Contractor for the construction of 20kv ESBN Substation and Windfarm Control Building as per ESBN specifications.Bulk excavation of peat on site . Excavation of floor slab area and laying of concrete slab. Wall construction of external cavity blocks and internal block walls. Placing of fire resistant foil backed plaster board and […]

Tullynamoyle Windfarm (Phase 1)

, , , , , , ,

Main Civils Contract for the construction of a 20kV Duct into Windfarm.The supply and laying of 7.5km of ESB Cable Ducting from  Tullynamoyle Windfarm to 110/20kv ESB sub-station at Corderry, Co. Leitrim. Excavation of trench as per ESB specifications,laying of duct and backfilling and reinstating of roadway along private and public roads.Tie into existing roads.Construction of […]

Sligo Racecourse demolition and ground-works

, , , , , ,

Project consisted of the demolition and ground-works. Beginning with demolition of existing old stand and Tote building with the use of 20 ton excavator and rock breaker. Disposal off site to certified landfill site and recycling facilities. Excavation of new foundation, placing of foundations to sub floor level. Site drainage and services.

Client: Kilcawley Construction

Our Roll: Sub-Contractor

Connaughton Rd Resurfacing of Car Park, Road

, , , , ,

Works carried out in Connaughton Rd  car park consisted of the construction of bus bay in existing car park and make car park alterations. The project including resurfacing of car park, road. Extending existing car park wall and to make a pedestrian entrance in the wall. Construction of new footpath along wall .Supply and installation […]

Stephen Street Car Park Construction

, , , , ,

Stephen St car park construction involved a number of different elements that not only include the following: Excavation for roadworks and ducting; Traffic management,removal of old kerb bank gateway; Supply and install mini pillar and ESB manhole; Breaking out of old footpath and reinstate new footpath; Laying of 69m of ESB duct; Lifting of old […]